ADVERTISEMENT FOR PROPOSALS
Sealed Proposals for Construction Manager-at-Risk (CMAR) services for the WEST TRAVIS COUNTY PUBLIC UTILITY AGENCY UPLANDS WATER TREATMENT PLANT PHASE IV EXPANSION will be received from Proposers on www.Civcast.com, until 2:30 PM Central Standard Time on August 28, 2026. Proposals received after this time will not be considered. Proposals will be evaluated in accordance with the CMAR procurement documents available on Civcast and Texas Government Code Chapter 2269.
The Project consists of the expansion of the West Travis County Public Utility Agency Uplands Water Treatment Plant, including the construction of three 5-MGD solids contact clarifiers, six 3-MGD high-rate gravity filters housed within reinforced concrete basins, and a dedicated Transfer Pump Station (TPS) within the filter pipe gallery. To support the increased plant capacity, the project also includes replacement of the High Service Pump Station (HSPS) pumps; expansion of the HSPS to accommodate a new electrical room; electrical and control system upgrades; SCADA system integration; expansion of the chemical building to accommodate an additional chlorine room, increased bulk and day tank chemical storage, and new chemical feed systems; relocation of selected chemical storage facilities; modifications to the existing Clearwell inlets, outlets, overflows, and venting systems; replacement of the existing backwash lagoons with new sludge basins; and associated site grading and yard piping improvements.
The selected Construction Manager at Risk (CMAR) will provide a preliminary estimate for construction services with the proposal and at the 60% design milestone followed by successful negotiation of a Guaranteed Maximum Price (GMP) for construction services for the Project at 90% design.
The Request for Proposals (RFP), including the procurement documents and available reference documents, may be obtained at www.civcast.com.
August 4, 11 2026
IPLAAS0155611