Notice to Local Small, Minority and Woman Businesses (SMWB)
SAK Construction, LLC is seeking local Small, Minority and Woman Businesses (SMWB) for the San Antonio Water System: Central Sewershed Package 10 (Terrell Hills) project. The project bids on October 21, 2026, at 2:00 PM local time.
Subcontracting Opportunities include but are not limited to:
1. Sewer pipe cleaning, obstruction removal by remote device, and CCTV inspection. All pipeline CCTV inspection must utilize an inclinometer visible on the video
2. Sewer construction work by open-cut methods, including but not limited to:
installation of manholes
adjusting existing manholes, including installation of new watertight ring and cover
repair and reconnection of sewer laterals
sewer pipe point repairs
Asphalt pavement removal and restoration
Concrete riprap removal and installation work
Manhole and sewer structure rehabilitation and coating
Bypass pumping
Traffic control
Fencing
Misc. surface restoration including sodding
SWPPP preparation
If your firm is interested in seeking this opportunity, please advise.
To view and/or obtain the plans and specifications for this project, visit www.saws.org and click on the Business Center. Then in the Contract Solicitations Login area on the right side of the page, select the Register Now link and proceed with registration.
For assistance in obtaining bonds, lines of credit, insurance, equipment, supplies, materials, and/or related assistance for this project, please contact Theresa Messer at 636-385-1000.
All local SMWB businesses should contact, IN WRITING, Patrick Hale at phale@sakcon.com to discuss the subcontracting opportunities. All negotiations must be completed by October 19, 2026. SAK will select the subcontract bids from the lowest responsive, responsible bidders.
IPLSAE0166173